Estimating & Pricing
InEight Estimating & Pricing helps you achieve greater accuracy by leveraging our flexible, feature-rich estimating software.
BENEFITS
- Gain increased confidence in your estimates because you have the appropriate level of detail for each stage of a project
- Better leverage your organizational history by validating new estimates with data-driven insights and benchmarks
- Increase your estimating team’s efficiency with software that ensures consistency and standardization
LESS TIME SPENT
producing early-stage estimates.
REDUCTION
in the estimate and control budget gap.
DRAMATIC INCREASE
in forecasting accuracy.
THE PILLARS OF ESTIMATING CONFIDENCE
InEight provides software solutions that help estimators validate their numbers with confidence and the ability to support and defend those “what if” scenarios.
Create benchmark-validated estimates — from high level to highly detailed — using templates, resources and cost and assembly libraries.
For contractors, confidently turn estimates into proposals with strategic markup and pay item pricing, alternate scenarios and subcontractor quote management.
Sync estimates with design models and project schedules to eliminate redundant data entry and gain new competitive advantages.
FEATURES
- Create realistic cost estimates using customizable templates, standardized resource and assembly databases, and real-time benchmarking of previous projects
- Leverage best-in-class capabilities to roll up and visualize estimates with tremendous flexibility, including multiple cost breakdown structures and unlimited work breakdown structures
- Create top-down or bottom-up estimates with ease
- Use historical benchmarks to validate estimates
RELATED SOLUTIONS
Solve more of your biggest project pain points by exploring additional solutions.
BUILDING INFORMATION
MODELING/DIGITAL TWIN
Delivers a common repository to connect design, construction and maintenance workflows throughout both project and asset life cycles.
COST BUDGETING &
FORECASTING
Empowers project stakeholders to create accurate forecasts and budgets based on real-time metrics.
Ready To Get Started?
Schedule a one-on-one consultation with an experienced InEight solutions expert.